- FS19
- 08
- 09.2020
- 19:22
FS19 Eurotunnel Single Arc
|
Opis
FS19 Eurotunnel Single Arc
Eurotunnel Single Arc contains the tunnels with different widths and lengths.
Widths: 6,50 meters, 8,50 meters, 9,30 meters, 10,40 meters and 12,00 meters
Lengths: 4,80 meters, 9,60 meters, 14,40 meters and 19,20 meters.
Capacity is from 18 to 338 bales
Price is from 1.250 to 12.500 €
Tunnel with automatic bale loading
Shop Category: Tools – Baling Technology
Tunnel without automatic bale loading
Shop Category: Placeable – Sheds
!!Important!!
Tunnel with automatic bale loading, please place only on self-levelled terrain and unload the bales before saving the game!
Autorzy
DD ModPassion
Zgłoś nadużycie lub niedziałający link
Komentarze do "Eurotunnel Single Arc"